How We Build Your Exhibition Stand

Our Process

From Floor Plan to Show Day

From your floor plan to the moment the doors open — here is the exact sequence, who does what, and when we need things from you. Every stand we build follows the same six stages, so nothing is left to chance and nothing gets rushed at the last minute.

Free 3D design before you commit, a fixed price, organiser approvals handled for you, and a project manager on the floor through build-up and show days.

Exhibition stand fabrication and build process in Dubai
Step by Step

The Six Stages of Your Build

A clear, predictable path from first brief to final dismantle — with fixed expectations at every stage.

1

Brief & Floor Plan

We need four things: the exhibition, your stand number and size, how many sides are open, and what you want the stand to do. Five minutes on a call or an email is usually enough.

Timeline: Day 0
2

Free 3D Design & Fixed Quote

Our designers produce a rendered 3D concept with a fixed price attached, usually back within 48–72 hours. Revisions are included and you are not committed to anything yet.

Timeline: Days 1–5
3

Organiser Approvals

Once the design is signed off we prepare and submit structural drawings, risk assessments, method statements, electrical load requests and rigging permits — started the same day.

2–4 weeks before build-up
4

Fabrication & Graphics

The stand is built in our own Dubai workshop while your graphics print in-house. We ask for final approved artwork 10–14 days before build-up. See stand graphics.

2–4 weeks before the show
5

Installation

Our crew delivers and builds during the organiser’s official build-up days, supervised by your project manager. The stand is complete, cleaned and powered before doors open.

Timeline: Build-up days
6

Show Support & Dismantling

A project manager is on call throughout the show for running repairs and changes. Afterwards we dismantle within the organiser’s window and store modular components for next time.

Show days & breakdown
Working Together

What We Need From You, & When

  • At the start: stand number, size, open sides and objectives.
  • Within a week of the 3D design: your feedback and sign-off — approval delays compress every stage that follows.
  • 10–14 days before build-up: final approved artwork and any product or exhibit dimensions.
  • Before the show: stand staff briefed on where power, storage and lighting controls are.

How Early Should You Start?

Six to eight weeks before build-up is comfortable for most stands. Below four weeks is possible but starts costing money in rush print and overtime. Above ten weeks and you get the pick of design attention and production slots.

If your show is close, tell us anyway — we would rather assess it than assume. See the shows we are building for on our upcoming exhibitions page, or browse the portfolio.

Ready to start?

Send us your stand number and floor plan — step one takes about five minutes of your time.

FAQ

Frequently Asked Questions

For a standard stand, six to eight weeks from brief to build-up is comfortable: 3D design within 48 to 72 hours, a week or so for approval and revisions, two to four weeks for organiser approvals, and two to four weeks for fabrication and graphics. Shorter timelines are possible but usually incur rush costs.

Yes. We produce a rendered 3D concept of your stand, with revisions, at no charge and with no commitment. We only invoice once you approve the design and the fixed quote and the project proceeds.

Final approved artwork should reach us 10 to 14 days before build-up. Backlit and tension-fabric panels in particular need production time, and last-minute reprints are expensive. If you are running late, tell us early — there is usually a workaround if we know in advance.

Yes. We prepare and submit the structural drawings, risk assessments, method statements, electrical load requests and rigging permits that the organiser and venue require, and we follow them through to sign-off on your behalf.